London Termini – London Bridge

London Bridge is the oldest of the Termini in London, and one of the combined termini where terminating platforms are alongside through services. Often derided in the past as gloomy and difficult to navigate, a 21st Century makeover was completed in 2018. It is now a sleek modern building, its angled lines smoothed out with a curvy façade on one side. London’s tallest building, The Shard, towers above it, literally pinpointing the stations position.

A brief history

In 1831 a railway was proposed between Greenwich and Tooley Street. Because it would run through very congested streets, it was agreed that the best course of action was to build a viaduct. This would become a huge 878 arch bridge, made from 60 million bricks which were made in Sittingbourne, Kent. Initially the viaduct had a walkway which people could use for the sum of 1 pence, enabling elevated views of the city. However this was closed during the expansion of 1840.

Partly opened in 1836 as far as Spar Road, the full line to London Bridge was opened in December 1836. The station at this time was very basic, steps or ramps up to the platforms which were totally open to the elements having no sheltering roof or trainshed whatsoever.

Expansion came very quickly, with the London and Croydon Railway Company and The South Eastern Railway company taking routes North and South respectively between 1839 and 1842. The increased traffic gave the station a new building in 1844, the first of many rebuilds London Bridge would have.

The most significant of these was in 1850, where the station was divided in two, the South Eastern taking control of the North side, and the newly formed London, Brighton and South Coast railway company the South side. A huge wall was erected, with both sides having differing rules and regulations, causing services such as horse drawn taxis to pay differing charges as they traversed the station.

This remined in place until 1923, when all the southern rail companies were amalgamated into the Southern Railway Company. A footbridge was built to link the two stations in 1928.

The arches under the station were used in the Second World War as air raid shelters, although conditions were very grim. Inspections declared they were unfit for use and demanded improvements to make them both safer and hygienic. Unfortunately, before any real improvements were made, a bomb hit London Bridge in February 1941, killing 68 and injuring a further 175.

A Major rebuild of the infrastructure and station occurred in the 1970’s. This included new signalling and rerouting of the lines in and out of London Bridge. The building was given a modern design, but people would still complain that it was cramped and uninviting.

It wasn’t until the early 2000’s that another rebuild would take place. The most radical and expensive so far, this time they seem to have got it right , as I shall explain in the rest of the blog.

A quick view of the current station

Although I label this as a quick view, the station is so vast that being quick here is not something i’d recommend if you wish to appreciate this new station.

Entering from the underground station, after going up the escalators you enter a passageway which is Joiner Street. Move into Joiner Street and you should soon see on your left the entrance to the Western Arches.

The Western Arches

Moving into here, the old pillars that are holding up the railway above you, go down this corridor in a pleasant symmetrical fashion. Shops are placed at the side, and the feel of this section is fantastic.

At the end of the passageway is another intersection, this time with Stanier street. Of note here is the plaques along the wall detailing the history of the station layout, well worth a look if you have the time.

Plaque in Stanier Street

Moving back to the end of the Western arches, and head of you is the main concourse – a sleeper in on one of the walls just as you are about to enter the concourse is dedicated to the opening in 2018.

Dedication plaque

Turning right here will take you down past more shops on your right, and the main ticket office on your left. Carry on down to the exit and you will see on your left a memorial to the railway workers who died in the first world war. This exit would take you into St Thomas’ street, next to St Thomas’ hospital, should you go through it.

First World War Memorial

Turning back into the main concourse, head all the way back to the Western Arches and carry on. You will see various gateline entrances to your right, as well as a big escalator and stairs in the middle which will take you up to the upper concourse and the bus station. Lets go up and take a quick look.

Up the escalator ahead of you is the glass frontage of what used to be known as the main entrance to the station. If you were to exit there, the Shard would be immediately to your right, with the bus station immediately in from of you. It is worth going out here just to marvel not only at the Shard, but the impressive all glass frontage to the station here (see the opening picture of this blog post).

Moving around the upper concourse the sense of natural light and space is very evident. Moving to the left you will find gatelines for Platforms 10-15. If you gain access to these platforms, try to take a moment to stand at the end of the terminating platforms, and you will be greeted by a very pleasant sight as the canopy structure over the platforms snakes away from you, yet another good photo opportunity.

A view down platforms 14 and 15

Lets go back downstairs to the main concourse, and turn right towards the exit for Tooley Street. Various gatelines will be on your right, as well as an information centre. Exiting into Tooly Street will give you a look at the new sweeping façade at this entrance. This mixes well with the original arches, which can be seen meandering away towards Greenwich. The view as you enter the station again is below.

View after entering via Tooley Street, note the huge escalators towering above you.

Moving into the station, we go through a gateline into the inner concourse. Impressive concrete pillars, looking like huge egg timers, are dotted around, with seating around their circumfrence. The space here is very welcoming due to the high ceiling. Various lifts are in the centre too, and ahead of you are the huge escalators which take you to platforms 1-15.

A view across the concourse post gateline, with the lift shafts, pillars and high roof.

Departure boards are placed around the lifts and on the side walls, really the wealth of information about arriving and departing train services is comprehensive.

I visited during rush hour, and yes it was busy, but the station layout as it is now didn’t seem to have any major congestion points. The station and surrounding structure is still being worked on, but all the major components are open, and it seems that at last London Bridge is able to cope with the passenger numbers it receives.

The video below shows London Bridge platforms at evening rush hour.


Please visit my Vlog site on YouTube

Please visit my Facebook page

Please visit my Instagram Page


Many thanks for reading, I’ll blog again soon.

Railway Stations Near Me – 2 – Higham

In the second of this series, I look at Higham Railway Station on the North Kent Line.  The station was 28 miles Down from its previous terminus at Charing Cross, however the Thameslink service no longer goes to Charing Cross, instead stopping at London Bridge before going though the London Core on its way to the its new end at Luton.

The first thing of note here is Higham Tunnel, at 1531 yards in length.  It originally was constructed in 1801 to serve the Thames and Medway canal, which acted as a passage for military traffic from Woolwich through Gravesend and Higham to the dockside at Chatham.  When traffic on the canal didn’t reach expected levels, the newly formed Gravesend and Rochester railway company acquired the canal and tunnel, putting a single track rail line alongside the canal.  This lead to the opening of Higham Station in 1845.

There are actually 2 tunnels, separated by what is locally known as ” the bomb hole”.  This was an area for the barges to cross.  The second tunnel is the “Strood” tunnel and at 2329 yards in length is the longest of the two.  The tunnels received extensive refurbishment in 2004 due to rock falls, and are now strengthened by steel and concrete.

A year later, the Gravesend and Rochester railway company was itself absorbed into the South Eastern Railway.  It is at this point the canal was drained fully, and a second rail line put in.  At this time the railway did not divert to the Medway towns, instead carrying on to Maidstone via the Medway Valley.  It was not until 1939 that a spur from Strood would carry trains onto the Chatham Main Line to Gillingham.

Higham would have a couple of sidings, both on the Up and Down lines, although both had been removed by the mid 1960s.  The most unusual piece freight unloaded by the station was a Swiss chalet in 1864 as a gift for Charles Dickens, who lived at nearby Gad’s Hill.

Although initially accessed by a foot crossing, platforms are reached via a lattice footbridge, a common sight throughout the Southern Region in the 20th Century.  The station building still survives, and was still heated by the original fireplace as late at the 1980’s.

The ticket office is open for only part of the day, at other times a permit to travel ticket must be purchased from a PERTIS machine, located by the bridge on the Up side. The station was served by SouthEastern until May 2018, when the new Thameslink Class 700 service to Luton/Rainham commenced and took over the 2 tph (each way) Stopping service.  Class 395 SouthEastern “Javelin” trains pass though, as well as various freight though the day, some heading for the nearby “Hoo Junction” Yard, around 2 miles further on the Up line.

Two pictures follow.  The first by me, shows a Class 66 hauling stone wagons exiting the Higham Tunnel on the Up line.  A train can also be seen passing through “The Bomb Hole” on the Down line heading towards Gillingham.

P1000393

The second is a view towards the station building, taken from the Down platform.  This photo by Nigel Thompson (credit under photo)

3614705_28c3986d

Higham railway station, Kent
cc-by-sa/2.0 – © Nigel Thompson – geograph.org.uk/p/3614705


Please visit Rainham Rail Enthusiast on YouTube.

Please visit Rainham Rail Enthusiast on Instagram.

Please visit Mistydale Model Railway on Facebook.


That’s all for now, thanks for reading and I’ll blog again soon.

The Class 700

On Sunday 20th May 2018, new rail services were due to start between Rainham in Kent and Luton.  Unfortunately, as well publicised in the media (here) things didn’t go according to plan.  But this is not what this blog is about.  This blog looks at the workhorse of that service, the new Class 700 unit, most of which at the time of this blog were owned by Thameslink (although Great Northern will have some).

The trains were built between 2014 and 2018 by Siemens in Germany.  The initial order was for 60 Eight car trains and 55 twelve car trains.  They are scheduled to replace all the class 319s on the Thameslink Network.

Their maximum speed is 100mph, and are electrically supplied with a third rail shoe (750 V DC) as well as a pantograph for overhead operation (25 Kv AC).  They are fully fitted with air conditioning, and a regenerative braking system.

The units are capable of working as ATO (Automatic train operation), which means the train can drive itself.  This is already in operation along the “Thameslink Core” which  links the East Coast mainline to the network around St Pancras.  The usual safety AWS is installed, as well as the ability to upgrade this easily to the new Digital Railway signalling as and when it is operational.

Two shots of the exterior of the train are below, one is of the information plate :P1000809P1000811

Interior shots of the train taken by myself at Rainham are below:

P1000813P1000816

The images above show the standard configuration in standard class.  1st class carriages have slightly better seats and tables.  As you can see, the train is totally able to be walked through, although first class carriages are separated.  On the 8 car trains there are 3 toilets (1 disabled).  I believe this is increased by one each om the 12 car trains.  Luggage racks above the seats are large, plenty of space for a small case.

The new information boards show various information, including carriage loading indicators and information on the London transport network:

P1000825P1000818P1000820P1000819P1000815P1000824P1000823P1000812

They also show the time and the next station stop, as well as the usual scrolling information about the service you are on and its destinations.  Overall, these are very impressive and very informative.

As good and shiny as this train is though however, its glaring problem is the seating in standard class, which is well documented if you perform a basic internet search.  Having done a full 2 and a half hour journey from Rainham (Kent) to Luton, I can indeed say that these seats are not built for that length of journey.  They are quite hard, and realistically I see only around an hour and a half being the maximum journey time you would want on them.

This however is not a problem.  The train is really designed with the commuter in mind, so the core user would only be using it for a short journey, either up to London from Medway, or up to London from Luton.  As a modern train it really performs well, with good acceleration and the ride comfort in relation to bumps and jolts is really very smooth. All onboard announcements are clear and concise.

If the lessons from the seating can be learnt, then new variants of this train could be learnt and improvements made to what is in essence a very fine unit.  As an addition to the fleet roster in the south east it is very capable, and notwithstanding the seats, a very enjoyable ride.


Please visit Rainham Rail Enthusiast  on YouTube

Please visit Rainham Rail Enthusiast On Instagram

Please visit Mistydale Model Railway On Facebook


That’s all for now, thanks for reading and I’ll blog again soon.